Post-project monitoring conclusion of the environmental impact assessment (EIA)

Post-project monitoring (hereinafter – PPM) of the planned activity is an integral part of the conclusion of the environmental impact assessment and is mandatory for the business entity

Why does your company need post-project EIA monitoring?

If your company has received an environmental impact assessment conclusion (EIA conclusion), then in order to fulfill the conditions stipulated by the EIA conclusion, you need to develop a post-project monitoring program and implement environmental measures approved by this program

What happens if your company does not conduct post-project EIA monitoring?

Cancellation of the decision

Conducting planned activities, for example, construction permits, special permits for subsoil use (part two of Article 13 of the Law of Ukraine “On EIA”)

Repeated EIA procedure

Passing the repeated procedure of environmental impact assessment (part three of Article 13 of the Law of Ukraine “On EIA”)

Prohibition

Temporary ban (suspension) and termination of activities of enterprises (paragraph 7, part one of Article 15, part two of Article 16 of the Law of Ukraine “On EIA”)

Fines, penalties, liability

Bringing to disciplinary, administrative, civil or criminal liability (part two of Article 15 of the Law of Ukraine “On EIA”)

What is included in post-project monitoring (PPM) of EIA?

Development of individual program and plan after project monitoring of EIA

taking into account the peculiarities of the planned activity of the facility and coordination with the authorized territorial / central body (Ministry of Ecology, Department / Department of Ecology and Natural Resources of the RSA)

Development of a schedule after project monitoring

taking into account the peculiarities of the planned activity of the facility and its coordination with the authorized territorial / central body (Ministry of Ecology, Department / Department of Ecology and Natural Resources of the RSA)

Direct implementation after project monitoring

with the use of high-precision technologies – mobile and portable laboratory equipment for monitoring and research (atmospheric air; water resources; land resources; noise levels, vibration; radiation levels (alpha, beta and gamma radiation)

Оформлення результатів

– preparation of measurement protocols;
-acts of equipment efficiency;
– research of all environmental parameters of certain conditions of the EIA conclusion

HOW LONG DOES POST PROJECT MONITORING (PPM) TAKE?

Preparation of the post-project monitoring program (PPM) 14 days
The post-project monitoring program (PPM) is developed for a period of 5 years

Cost

Development and implementation of the monitoring program

from 50 000 UAH

Development of the monitoring
program

The term is 14 days

from 40 000 UAH

Implementation of the EIA monitoring program activities

It is being developed for a period of 5 years

Why choose ESL

Expertise

A staff of environmental experts with vast practical experience who can provide full consulting support and implement the measures included in the program.

Work experience

We have developed more than 30 programs after project monitoring and are implementing them for different areas of activity.

Laboratory

Modern high-precision and mobile equipment for the implementation of field measurements provided for by the developed PPM program.

Attention to detail

You can be sure that our experts will take into account all your wishes and focus on practical solutions to all issues related to the developed documentation and performed works.

To calculate the cost of developing and conducting a post-project EIA monitoring program for your company

Please fill out the form. After filling it out, an ecologist will contact you.

    We work with the following projects

    Sand quarry

     

    We got acquainted with the ESL company through word of mouth, and our partners and the company conducted instrumental measurements to implement the post-project monitoring plan. We contacted ESL to analyse the received EIA conclusion to determine the mandatory works and fulfilment of the conditions of turnkey post-project monitoring on an extended basis.

    The company takes over all decisions, freeing up our time to fulfil our target tasks. The company’s specialists carried out high-quality and fast work on instrumental measurements. They performed a complete analysis of the EIA conclusion, identified pain points of the possible negative impact of our company’s activities on the environment and recommended solutions.

     

    Sand quarry
    Head of the environmental protection department
    Asphalt concrete plant

    We got acquainted with ESL company at the exhibition, exchanged contacts. After the exhibition we had an online consultation on our enterprise. We were keenly interested in the question of the need to conduct an EIA procedure.

    It turned out that ESL has its own mobile laboratory that conducts instrumental measurements throughout Ukraine. The company’s specialists determined the criteria for the production activities of the enterprise, according to which they identified the need for an EIA procedure. As part of the procedure, ESL independently developed and uploaded to the register an EIA report and all documents in accordance with the established procedure.

    We received a permit document – an EIA conclusion, which allows our company to operate within the framework of the current environmental legislation.

    Asphalt concrete plant, director

    Agricultural sector

    Manager Yulia called and offered advice on the need to develop and obtain environmental documentation. We had a question on our “agenda” – to determine the difference between a special water use permit and a special permit for the use of subsoil.

    Yulia answered questions within the framework of a free audit and identified the need to obtain a permit for special water use, as we have a well on the balance sheet from which water is taken more than 5 cubic meters per day, but not more than 300 cubic meters per day.

    We managed to save the company from paying penalties in the amount of 5 times for using water without the established limit for water intake in the permit for special water use.

    The enterprise for growing crops,
    director

    Grain terminal

    We found ESL on the Internet, looked at the website and decided to test a free consultation. We asked about the possibility of adjusting the existing emission permit.

    Oleksiy contacted us and not only answered our questions, but also advised on the measurement of our sources of pollutant emissions into the air. Working with experts is very comfortable, so we chose ESL.

    The guys registered a report on the inventory of emission sources, and registered the enterprise with the Ministry of Environment of Ukraine. They received a permit for emissions of pollutants into the atmosphere for 10 years.

    As a result, we have put in order the environmental documentation in and streamlined the payment to the tax authorities for air pollution.

    Grain terminal,
    environmental protection specialist

    The company is a waste disposer

    We found ESL on Facebook, contacted the messenger with a question about the need to develop a declaration or register card for waste.
    The company’s specialists conducted a free audit of documentation with a visit to the enterprise, developed a register card according to form number 2 and included it in the register of waste generation facilities.

    We have finally figured out the nomenclature and volumes of waste generation, quantitative and qualitative characteristics of waste. Now there are plans for measures to reduce the volume of waste generation and the degree of their hazard.

    The company is a waste disposer
    director
    Winery

    ESL was recommended by friends who have been working with ESL for many years.

    We asked a question regarding the timing of the registered waste inventory report. The main point in the decision to work with the company was the availability of certificates and certificates that give the right to develop project documents.

    Specialists visited the site, identified new types of waste that were not included in the existing inventory, conducted a re-inventory and received positive responses from the Department of Ecology of Odesa Oblast.

    As a result, we have an understanding of what types of waste are generated at the enterprise and how to handle them.

    The winery,
    chief engineer